top of page

Studio: Planning + decisions

  • celineframpton
  • Nov 14, 2021
  • 2 min read

Updated: Nov 21, 2021

Rough sketch to show idea of install strategy

ree

3 X projectors

4X sound objects

5 x etchings (150 x 150)

5 MDF "models" projection grounds + off cuts

2/3 physical objects - from mid year + their hooks

ree


ree



Testing Aesthetic quality (?) or cohesiveness of material / material conversations (?)


Below - RAW MDF - easy drill during instal / easy to modify

"Drawings" - Polyprop - bendable

Etching - Clear perspex 3mm

Sound object - electrical components, 2mm clear perspex

Projector components (to be housed in Perspex container + threaded rod stand _ max height 1m approx



- continuity of "raw" material? Manipulated but not covered...?

ree

Tests with MDF and sound object added and etching


ree

ree


ree

VS


Free standing etching on 3mm clear perspex (2 day turn around - was delayed by bigger pieces but go them to ship this past Friday...)

ree

Etching close up - just to see quality of lines

ree


Etching against white ground - checking contrast if I mount these off of the large projection pieces (MDF)

ree

Etching against raw MDF - greater contrast than white - etching lines almost become white.

ree


ree

Tests if I decided to paint ground ... white background + etching infilled with black paint..... Normal etching + grey painted ground.... (not MDF but would be MDF)



ree

2 X free standing etchings (150x150mm)



ree

ree

3 x mounted etchings (150x150mm)



---


These are grounds / sculptures? for stickers (replacing the transfers) to be placed on - this is still in test phase an "added" line that might not work out... These are minis... flattened the white Polyprop would be A3/A2 Max. Clear perspex will be subbed for MDF (raw or painted)

ree

ree

ree


ree


--------


Not pictured "install" elements - Website via Tablet - tested - need to upload all files but design wise Ready To Go


and AR objects vis phone (Objects have to be virtually "placed" in the space) - tested - Ready To Go basically




and a map - which has to be finalised on layout - also might be too didcdic / un-necessary? Acting as a list of works - rather than an artefact. Mapping the objects/ works place in space. Helps with a level of connection?


Style continuity with site

idea of the Paralink? add underline..

ree

 
 
 

Comments


bottom of page